Campaign operations: launch, troubleshoot, reconcile
Pre-launch checklist
Commercial: Signed IO/SOW or equivalent authorization; payer; rates; gross/net accounting; line items; fee treatment; approved dates; cancellation and budget authority. Audience: Device constraints; allowed geographies; approved data; frequency rules; content and publisher restrictions. Creative: Final files; IDs; audio specs; approval versions; required disclosures; captions; VAST tags; URLs; backup creative. Measurement: Counting source; tags or API events; IVT verification; agreed metric definitions; reporting access; conversion windows. Operations: Deal IDs; DSP activation; floors; bid rules; timezone; spend caps; escalation contact and pause authority.
The first 24 hours
Confirm that approved creatives are actually eligible and serving. Check that device type is CTV, not a blended video package. Validate geographic impressions to the resolution of the available signal. Confirm planned budget pacing, app-level visibility, no unexpected category rejection, and response/verification beacon activity. Escalate missing spend before the end of the first day when deadlines are fixed.
Deal troubleshooting: symptom to cause
| Symptom | Likely checks | First action |
|---|---|---|
| Many requests, few bids | DSP targeting, data mismatch, floor, bid limits | Compare request eligibility and buyer bid logs |
| High bids, low wins | Competitive CPM, floor rules, deal priority | Check auction diagnostics and effective bid |
| Winners, few impressions | Creative rejection, asset timeout, SSAI/ transcode issue | Examine VAST errors and ad-server playback logs |
| High spend, low unique reach | Narrow universe, overlap, broken frequency deduplication | Inspect frequency distribution by household |
| Unexpected geography | IP/household location error, ZIP/district mismatch | Review signal methodology and suppress weak geos |
| High completion, poor IVT quality | Server spoofing, non-human traffic, measurement differences | Inspect verification breakdown and supply path |
| Invoice discrepancy | Different counting events, time zones, IVT deductions | Compare line-level records and contract terms |
- Symptom
- Many requests, few bids
- Likely checks
- DSP targeting, data mismatch, floor, bid limits
- First action
- Compare request eligibility and buyer bid logs
- Symptom
- High bids, low wins
- Likely checks
- Competitive CPM, floor rules, deal priority
- First action
- Check auction diagnostics and effective bid
- Symptom
- Winners, few impressions
- Likely checks
- Creative rejection, asset timeout, SSAI/ transcode issue
- First action
- Examine VAST errors and ad-server playback logs
- Symptom
- High spend, low unique reach
- Likely checks
- Narrow universe, overlap, broken frequency deduplication
- First action
- Inspect frequency distribution by household
- Symptom
- Unexpected geography
- Likely checks
- IP/household location error, ZIP/district mismatch
- First action
- Review signal methodology and suppress weak geos
- Symptom
- High completion, poor IVT quality
- Likely checks
- Server spoofing, non-human traffic, measurement differences
- First action
- Inspect verification breakdown and supply path
- Symptom
- Invoice discrepancy
- Likely checks
- Different counting events, time zones, IVT deductions
- First action
- Compare line-level records and contract terms
Change control
Require an approver for material changes in campaign dates, spend, geography, audience, publisher or creative claims. Log who changed what, when, why and how the downstream delivery changed. Make the escalation chain short enough for election-week and emergency campaigns.
The campaign closeout package
Provide the final approved creatives and version IDs; detailed delivery with time zone and creative breakout; budget and fees; reported and validated impressions; available app/publisher transparency; unique reach and frequency methodology; discrepancy reconciliation; explanation of missed or bonus delivery; billing and purchase-order mapping; experiment results when applicable; and a brief list of lessons learned.
Standards and platform rules change; confirm applicable regulations, requirements and current specification status.
