Skip to content

Fastwell / Field Guide 09 of 11

Campaign operations: launch, troubleshoot, reconcile

Audience
Traffickers, DSP operators, ad-ops managers and account leads.
Purpose
Establish a repeatable operating process for high-stakes CTV campaigns.
Reading
3 min

Campaign operations: launch, troubleshoot, reconcile

§01

Pre-launch checklist

Commercial: Signed IO/SOW or equivalent authorization; payer; rates; gross/net accounting; line items; fee treatment; approved dates; cancellation and budget authority. Audience: Device constraints; allowed geographies; approved data; frequency rules; content and publisher restrictions. Creative: Final files; IDs; audio specs; approval versions; required disclosures; captions; VAST tags; URLs; backup creative. Measurement: Counting source; tags or API events; IVT verification; agreed metric definitions; reporting access; conversion windows. Operations: Deal IDs; DSP activation; floors; bid rules; timezone; spend caps; escalation contact and pause authority.

§02

The first 24 hours

Confirm that approved creatives are actually eligible and serving. Check that device type is CTV, not a blended video package. Validate geographic impressions to the resolution of the available signal. Confirm planned budget pacing, app-level visibility, no unexpected category rejection, and response/verification beacon activity. Escalate missing spend before the end of the first day when deadlines are fixed.

§03

Deal troubleshooting: symptom to cause

Symptom
Many requests, few bids
Likely checks
DSP targeting, data mismatch, floor, bid limits
First action
Compare request eligibility and buyer bid logs
Symptom
High bids, low wins
Likely checks
Competitive CPM, floor rules, deal priority
First action
Check auction diagnostics and effective bid
Symptom
Winners, few impressions
Likely checks
Creative rejection, asset timeout, SSAI/ transcode issue
First action
Examine VAST errors and ad-server playback logs
Symptom
High spend, low unique reach
Likely checks
Narrow universe, overlap, broken frequency deduplication
First action
Inspect frequency distribution by household
Symptom
Unexpected geography
Likely checks
IP/household location error, ZIP/district mismatch
First action
Review signal methodology and suppress weak geos
Symptom
High completion, poor IVT quality
Likely checks
Server spoofing, non-human traffic, measurement differences
First action
Inspect verification breakdown and supply path
Symptom
Invoice discrepancy
Likely checks
Different counting events, time zones, IVT deductions
First action
Compare line-level records and contract terms
§04

Change control

Require an approver for material changes in campaign dates, spend, geography, audience, publisher or creative claims. Log who changed what, when, why and how the downstream delivery changed. Make the escalation chain short enough for election-week and emergency campaigns.

§05

The campaign closeout package

Provide the final approved creatives and version IDs; detailed delivery with time zone and creative breakout; budget and fees; reported and validated impressions; available app/publisher transparency; unique reach and frequency methodology; discrepancy reconciliation; explanation of missed or bonus delivery; billing and purchase-order mapping; experiment results when applicable; and a brief list of lessons learned.

Standards and platform rules change; confirm applicable regulations, requirements and current specification status.